Yankoo Part of the Koodaideri Project

Koodaideri project was completed for RIO TINTO, comprising of three new 50 metre towers complete from foundation work through to all antenna and comissioning works, the three sites were Koodaideri, Yankoo and Yandi 220Kv Sub station, Yankoo was by far the most difficult logistically, a dozer was used to maintain the access track and safely assist all non all wheel drive vehicles to access the site as the hill track was over 20 degrees in parts and corners provided a difficult area to get good traction, a lot of prior work was required to ensure that this was done with 100% efficiency and safety