Dunsborough RBS 200 upgrade.

Dunsborough RBS 200 upgrade.
The following works were carried out by CCR
1. Upgrade the existing site from two RBS 200’s to three 2202’s.
2. Install additional IMH equipment.
3. Carry out the additional feeder and antenna work and upgrades.
4. Carry out tower strengthening works
5. logistics for all equipment required and made redundant from the upgrade
As you can see from the before and after photos, we provide a quality service where care and time are taken to provide the client with an end product second to none.
We will, when and where possible, make improvements to the existing work. This is obviously dependant on time, cost and service affecting issues.